Aries Industrial Park

ABOUT

Aries Industrial Park is a 54.4-hectare industrial & logistic park situated in ​​Turda, Cluj County, at a distance of 25 km from Cluj-Napoca, the biggest city in the region and one of the most important business and cultural centers in Romania.

Aries Park is a modern project of industrial halls with storage or production spaces, having a maximum potential to accommodate 235,000 sq m of constructions. 

Turda is one of the most developed regional cities and confirms its attractiveness in terms of strategic positioning at the intersection of North-South and East-West transport infrastructure (E81, E60, A3 and A10).

 

  • Area: 54.4 ha
  • Land available: 27 ha
  • Type: Industrial & Logistics
  • Operational Stage: Operational
  • Ownership: Afin Holding

Standard project characteristics – Warehouse & offices:

  • Warehouse / Production facility, including offices and social areas
  • Precast reinforced concrete structure
  • Sandwich panels façade & fire walls

Structure

  • Designed according to latest norms and local geological conditions
  • Precast reinforced concrete frame
  • Pre-stressed reinforced concrete beams and purlins
  • 12x24 m grid of columns
  • Height under the beams: 11.5 m

Floor

  • Reinforced concrete slab in warehouse area
  • Designed for load bearing capacity of 5 tons/m²
  • Finished with a mineral dry shake (4 kg/ sqm – max 5 kg/sqm admixture) and sealing coating
  • Machine finished
  • Dustless

Roof

  • Flat type roof with the slope 2-3%
  • Roof structure: trapezoidal steel sheet mounted on purlins, 0.25 mm vapor barrier, high quality 120 mm mineral wool, 1.2 mm PVC membrane with permanent UV resistance
  • Perimeter attic, min. 10 cm above the maximum height of the roof
  • Roof skylights with polycarbonate filling, min 1% from the roof area for heat and smoke extraction, opening system according to the fire protection design
  • Siphonic roof drainage with safety overflows

Cladding – façade

  • Façade: 100 mm PIR sandwich panels; RAL 9006 external; RAL 9002 internal
  • Windows: each 6m section of the main façade will include groups of windows 2mx1m and/or 1mx1m

Walls and partitions

  • Between fire compartments: partitioning walls made of sandwich panels on bearing steel columns. Fire protection rating according to the fire protection design and applicable norms
  • Between office area and the hall – block work, sandwich panel or gypsum board with mineral wool insulation partitions on the upper floors, fire protection rating according to the fire protection design and applicable norms

Doors

  • Drive-in industrial sectional doors, 40 mm heat insulated sandwich panel leaf, dimensions 4x4,5 m, motorized control, built-in emergency door, mechanical locking latch
  • Sectional doors, 40 mm heat insulated sandwich panel leaf, dimensions 3x2.7 m, motorized control, mechanical locking latch, interconnecting module with the dock leveler
  • Hydraulic dock levelers, dimensions 2.5×2 m, dynamic load capacity of 6,000 kg, bumpers and metallic guiding elements, height of the dock leveler: 1.10 m from the platform
  • Emergency exit doors with push bar according to fire safety scenario

Offices and meeting rooms

  • Floor: carpet, PVC or heavy-duty tiles
  • Walls: gypsum board with mineral wool insulation, wear resistant white paint
  • Ceiling: 60×60 cm mineral tiles, min. clear height 2.75 m
  • Wiring duct along the entire façade below the window line
  • Heat and cool air conditioners, interior units hidden above the suspended ceiling; quantity, power and location of the units designed for open-plan space; natural ventilation by windows or by ventilation units in rooms without windows

 

Utilities are available at the West border of the plot:

  • Low pressure gas connection with a capacity of 29MW
  • Electricity connection with medium voltage cable, and additionally a sub-station located at 150 m from the North border
  • Water supply with capacity of 20 l/s
  • Public sewage network

Warehouse and offices utilities:

Electrical installations

  • Power connection, electrical distribution station dimensioning according to requirements, 20 Watt for every m² of built area
  • Socket boxes with circuit breakers and residual current devices (2 × 230 V – 16 A + 1 × 400 V – 32 A) every 2,500 m², mounting height: 1.4 m from the floor
  • Two 230 V sockets every 8 m² in offices
  • Two LAN (data) sockets every 8 m² in offices
  • Grounding system, max 1 Ohm resistance
  • Active lightning protection system according to norms

Lighting

  • LED lighting system for the hall
  • Light intensity at 0.7-1.0 m from the floor:  offices – 500 lux, warehouse and technical rooms – 150 lux, corridors between the racks – 150 lux
  • External water-resistant lighting fixtures at 24 m intervals

Heating

  • Design heating temperature for winter: 15˚C. Gas roof heaters.
  • Design temperature for the offices: 22˚C for winter and 25˚C for summer
  • Heating & Cooling in offices, meeting rooms and reception
  • Cooling in server room: wall-hung split unit up to 12,000 BTU

Other

  • Fire alarm system
  • Fire extinguishing system
  • Complete sewage system for rain water and waste water; oil separators for the water collected from the platform 

 

 

  • Accessible from the North, South and West (E81, E60, A3 and A10)
  • Turda city center - 7 km
  • A3 - 2 km
  • Bus station - 300 m
  • Raleway - 5,4 km
  • Cluj-Napoca - 25 km
  • Bucharest - 430 km

 

  • ACS Industries Europe - Production of airbag filters and other automotive parts
  • Hettich - Production of magnesium die-casting for automotive and furniture hardware industries
  • STADA - Pharmaceutical manufacturing

 

  • Land and building tax exemption.
  • Has zoning plan (PUZ) for industrial, storage, logistic activities, commercial, banking, offices & gas stations or related activities.
  • Easy connection to public transport.
  •  Ready to accommodate any client requirement, either with rent or sell possibility.
  • Build to suit - their team of Designers & Project Managers can assist you in defining the requirements for your custom-built space.

 

  • Area: 54.4 ha
  • Land available: 27 ha
  • Type: Industrial & Logistics
  • Operational Stage: Operational
  • Ownership: Afin Holding

Standard project characteristics – Warehouse & offices:

  • Warehouse / Production facility, including offices and social areas
  • Precast reinforced concrete structure
  • Sandwich panels façade & fire walls

Structure

  • Designed according to latest norms and local geological conditions
  • Precast reinforced concrete frame
  • Pre-stressed reinforced concrete beams and purlins
  • 12x24 m grid of columns
  • Height under the beams: 11.5 m

Floor

  • Reinforced concrete slab in warehouse area
  • Designed for load bearing capacity of 5 tons/m²
  • Finished with a mineral dry shake (4 kg/ sqm – max 5 kg/sqm admixture) and sealing coating
  • Machine finished
  • Dustless

Roof

  • Flat type roof with the slope 2-3%
  • Roof structure: trapezoidal steel sheet mounted on purlins, 0.25 mm vapor barrier, high quality 120 mm mineral wool, 1.2 mm PVC membrane with permanent UV resistance
  • Perimeter attic, min. 10 cm above the maximum height of the roof
  • Roof skylights with polycarbonate filling, min 1% from the roof area for heat and smoke extraction, opening system according to the fire protection design
  • Siphonic roof drainage with safety overflows

Cladding – façade

  • Façade: 100 mm PIR sandwich panels; RAL 9006 external; RAL 9002 internal
  • Windows: each 6m section of the main façade will include groups of windows 2mx1m and/or 1mx1m

Walls and partitions

  • Between fire compartments: partitioning walls made of sandwich panels on bearing steel columns. Fire protection rating according to the fire protection design and applicable norms
  • Between office area and the hall – block work, sandwich panel or gypsum board with mineral wool insulation partitions on the upper floors, fire protection rating according to the fire protection design and applicable norms

Doors

  • Drive-in industrial sectional doors, 40 mm heat insulated sandwich panel leaf, dimensions 4x4,5 m, motorized control, built-in emergency door, mechanical locking latch
  • Sectional doors, 40 mm heat insulated sandwich panel leaf, dimensions 3x2.7 m, motorized control, mechanical locking latch, interconnecting module with the dock leveler
  • Hydraulic dock levelers, dimensions 2.5×2 m, dynamic load capacity of 6,000 kg, bumpers and metallic guiding elements, height of the dock leveler: 1.10 m from the platform
  • Emergency exit doors with push bar according to fire safety scenario

Offices and meeting rooms

  • Floor: carpet, PVC or heavy-duty tiles
  • Walls: gypsum board with mineral wool insulation, wear resistant white paint
  • Ceiling: 60×60 cm mineral tiles, min. clear height 2.75 m
  • Wiring duct along the entire façade below the window line
  • Heat and cool air conditioners, interior units hidden above the suspended ceiling; quantity, power and location of the units designed for open-plan space; natural ventilation by windows or by ventilation units in rooms without windows

 

Utilities are available at the West border of the plot:

  • Low pressure gas connection with a capacity of 29MW
  • Electricity connection with medium voltage cable, and additionally a sub-station located at 150 m from the North border
  • Water supply with capacity of 20 l/s
  • Public sewage network

Warehouse and offices utilities:

Electrical installations

  • Power connection, electrical distribution station dimensioning according to requirements, 20 Watt for every m² of built area
  • Socket boxes with circuit breakers and residual current devices (2 × 230 V – 16 A + 1 × 400 V – 32 A) every 2,500 m², mounting height: 1.4 m from the floor
  • Two 230 V sockets every 8 m² in offices
  • Two LAN (data) sockets every 8 m² in offices
  • Grounding system, max 1 Ohm resistance
  • Active lightning protection system according to norms

Lighting

  • LED lighting system for the hall
  • Light intensity at 0.7-1.0 m from the floor:  offices – 500 lux, warehouse and technical rooms – 150 lux, corridors between the racks – 150 lux
  • External water-resistant lighting fixtures at 24 m intervals

Heating

  • Design heating temperature for winter: 15˚C. Gas roof heaters.
  • Design temperature for the offices: 22˚C for winter and 25˚C for summer
  • Heating & Cooling in offices, meeting rooms and reception
  • Cooling in server room: wall-hung split unit up to 12,000 BTU

Other

  • Fire alarm system
  • Fire extinguishing system
  • Complete sewage system for rain water and waste water; oil separators for the water collected from the platform 

 

 

  • Accessible from the North, South and West (E81, E60, A3 and A10)
  • Turda city center - 7 km
  • A3 - 2 km
  • Bus station - 300 m
  • Raleway - 5,4 km
  • Cluj-Napoca - 25 km
  • Bucharest - 430 km

 

  • ACS Industries Europe - Production of airbag filters and other automotive parts
  • Hettich - Production of magnesium die-casting for automotive and furniture hardware industries
  • STADA - Pharmaceutical manufacturing

 

  • Land and building tax exemption.
  • Has zoning plan (PUZ) for industrial, storage, logistic activities, commercial, banking, offices & gas stations or related activities.
  • Easy connection to public transport.
  •  Ready to accommodate any client requirement, either with rent or sell possibility.
  • Build to suit - their team of Designers & Project Managers can assist you in defining the requirements for your custom-built space.

GALLERY